(479) 997-1321 info@mulberryar.gov

Mulberry Blog

 

Jun 15, 2023

The two walking bridges at the City Park have been replaced. The prior bridges were starting to age and needed to be replaced. Local craftsman Duane Ivy completed the project and the bridges are ready to be used. The bridges need to outgas before they can be painted. So for a short time the bridges will be in the natural wood color but will be painted soon.

Gallery

Call Us Now

(479) 997-1321